Broomfield Heights Middle School

EDUCATIONAL

BOULDER, US

2020 – 2022

EDUCATIONAL

BOULDER, US

2020 – 2022

Broomfield Heights Middle School BIM: Fresh Construction for Learning

A New 2-Story building, 220,000-square-foot New building with classrooms, Gym, Cafeteria, Basketball cout, Support areas and Open Areas.

PROCESS

C2A developed and coordinated multi-trade BIM models for the new 220,000-square-foot, two-story educational building, including full-trade modeling, RFI tracking, and the production of shop and As-Built drawings.

RESULTS

Our detailed architectural, structural, and MEPF BIM modeling enabled seamless coordination across all disciplines, improving design accuracy and minimizing conflicts. This integrated approach facilitated a smoother construction process and delivered a fully coordinated, construction-ready model.

SCOPE OF WORK

ALL TRADES MODELING & PRE-COORDINACTION
RFI/ISSUE TRACKING
HVAC MODELING AND COORDINATION
PLUMBING MODELING AND COORDINATION
ELECTRICAL MODELING AND COORDINATION
SHOP/INSTALLATION DRAWING ISSUING
AS-BUILT MODELING

PROJECT INFO

TEAM 4 BA + 1 PM

Let's talk about your next project.